TRACECA - Technical Assistance Studies

PROJECTS

CONTRACTOR

STARTING DATE

DURATION
(Months)

BUDGET
(EURO)

1. "Dolphin" project, feasibility study for caravanserai West-East GmbH

August 1995

27

475,000

2. Transport Management Training Nethconsult

December 1995

8

900,000

3. Transport Legal and Regulatory Framework Scott Wilson K.

December 1995

24

1,500,000

4. Maritime Training in Baku Port HPTI

December 1995

24

1,350,000

5. Regional Traffic Forecasting Model WS Atkins

January 1996

21

700,000

6. Road Transport Services (Caucasus) DHV Consultants

January 1996

18

250,000

7. Intermodal Transport BCEOM

January 1996

11

500,000

8. Railways Infrastructure Maintenance (Caucasus) TEWET

January 1996

14

1,200,000

9. Implementation of Pavement Management Systems Kocks Consult GmbH

March 1996

21

2,000,000

10. Road Transport Services (Central Asia) GIBB

March 1996

19

700,000

11. Ferry Terminals : Baku § Turkmenbashi RAMBOLL

March 1996

23

1,550,000

12. Rolling Stock Maintenance SYSTRA

March 1996

12

700,000

13. TRACECA Trade Facilitation Scott Wilson K.

March 1996

16

980,000

14. Railways Infrastructure Maintenance (Central Asia) DE-Consult

March 1996

11

1,200,000

15. Joint Venture for the Trans-Caucasian Railways TEWET

July 1996

12

2,000,000

16. Railways Tariffs and Timetable SISIE

July 1996

18

1,500,000

17. TRACECA Co-ordination Team TRACTEBEL Development Engineering

September 1996

40

2,550,000

18. Central Asian Railways Restructuring and Telecommunications Studies CIE Consult

August 1997

11

2,000,000

19. Road Maintenance FINNROAD

August 1997

27

2,500,000

20. Feasibility Study of New Terminal Facilities in the Georgian Ports of Poti and Batumi HPTI

August 1997

12

1,500,000

21. Restructuring of the Azeri and Georgian Railways GIBB

July 1998

6

1,000,000

22. Intermodal Services Implementation and Training POLZUG

August 1998

18

1,600,000

23. International Road Transport and Transit Facilitation (IRU) Scott Wilson K.

August 1999

18

2,800,000

24. Traffic Forecasting and Feasibility Studies BCEOM

August 1999

18

2,000,000

25. Intergovernmental Commission for Multilateral Agreement AXIS

  December 1999

14

  1,100,000

26. Caucasian Road Sector - Feasibility Study for the Rehabilitation and Reconstruction of the Road Link between Baku, Tbilisi and Yerevan KOCKS November 2000 12 2,000,000
27. Customs Facilities at C. Asian Road Border Crossings Computer Solution   18 2,000,000
28. Inter-Governmental Commission for the Implementation of the Multilateral Agreement on Transport - Continuation AXIS January 2001 12 1,050,000
29. Harmonisation of Border Crossing Procedures to be contracted in 2001 May 2001 24 2,000,000
30. Unified Policy on Transit Fees and Tariffs to be contracted in 2001 in preparation 24 2,000,000
31. TRACECA co-ordination Team to be contracted in 2001 in preparation 24 2,500,000
32. Pre-fesability Study of a New Rail Link between the Ferghana Valley, Bishkek and Kashgar (China) to be contracted in 2001 in preparation 12 1,500,000
33. Central Asia Railways Telecommunications to be contracted in 2001 in preparation 12 1,500,000
     

SUBTOTAL

 49,105,000

    TRACECA - Investment Projects
for the Rehabilitation of Infrastructure

PROJECTS

CONTRACTOR

STARTING
DATE

DURATION
(Months)

BUDGET
(EURO)

1. Rehabilitation of the Caucasian Railways Several contractors

October 1995

9

5,000,000

2. Rehabilitation of the Red Bridge and Construction of the TRACECA bridge Khidmsheni JSC
Azermost
March 1997

18

2,500,000

3. Bukhara Cotton Export Distribution Center See under 8.

February 1998

12

2,000,000

4. Container Services Between the Caspian Ports of Baku and Turkmenbashi GABEG
and several other contractors

February 1998

19

2,500,000

5. Design and construction of Rail Ferry Facilities in the Port of Poti, Georgia Athena Hellenic Engineering and several other contractors

February 1998

12

3,400,000

6. Improvement of the existing rail ferry terminal and construction of facilities at Ilyichevsk, Ukraine COSMAR/BCEOM
and several other contractors

August 1998

16

6,400,000

7. Establishment of a Ferry Cargo Movement Computer System and Supply and Installation of Computers
and Communication Equipment for the Ports of Ilyichevsk (Ukraine) and Poti (Georgia)
Computer Solutions

January 1998

17

1,500,000

8. Cargo and Container Handling Equipment for the Seaports of Baku (Azerbaijan), Turkmenbashi (Turkmenistan), Poti (Georgia) and Ilyichevsk (Ukraine) Several Contractors

February 1998

18

5,825,000

9. Rail Tank Wagon Cleaning Boilers in Baku (Azerbaijan) Noviter Oy

June 1999

6

475,000

10. Intermodal/Terminal Equipment (Karmir Belur, Chimkent, Aktau, Bishkek) BossProTec, HoldTrade, PlanMarine, UnitExport

August 1999

9

2,500,000

11. Supply of an Optical Cable System for Communication and Signalling to the Railways of Armenia, Azerbaijan and Georgia Siemens AG/Siemens ATEA

February 2000

  24

  15,000,000

12. Rehabilitation of the Rail Ferry Terminal at Aktau. AZERCORPU October 2001

12

2,000,000

13. Supply of navigational aid equipment to be contracted in 2001 in preparation

12

2,000,000
            GRAND TOTAL 100,205,000